Cubica
08
LNEC NP EN 1998-3

Rapid seismic assessment.

Application of the expedited methods developed by LNEC to the seismic assessment of masonry and reinforced concrete buildings, in accordance with Portaria no. 302/2019.

Do you know your building's seismic vulnerability? Most have never been assessed.

Portugal is exposed to earthquakes of moderate to high magnitude, and many existing buildings were not designed to withstand them adequately. For extension, alteration or reconstruction works, Portaria no. 302/2019 sets out the cases in which assessing a building's seismic vulnerability is mandatory and, where the resisting capacity falls below 90 % of the regulatory demand, requires a seismic strengthening design. For buildings within their domain, LNEC's rapid methods carry out that assessment with little data, from the model or the drawings.

When it is mandatory. In extension, alteration or reconstruction works, whenever at least one of these conditions applies (Portaria no. 302/2019, art. 1):

For buildings in importance classes III and IV of NP EN 1998-1:2010 (schools, hospitals, assembly buildings), both 25 % thresholds drop to 15 % — note that class III and IV buildings fall outside the scope of the expedited methods (which cover classes I and II) and require detailed assessment to NP EN 1998-3; we refer those cases on. The regime does not give municipalities powers to appraise the report: Decreto-Lei no. 95/2019 (art. 8, no. 3, as amended by Decreto-Lei no. 10/2024) provides that the Portaria «cannot confer powers on municipalities to appraise the seismic vulnerability assessment report». Technical responsibility for the report lies with whoever signs it, through the statement of responsibility (termo de responsabilidade).

Reasons to trust the result.

Download the validation technical note (PDF, 12 pages, in Portuguese) →

On your side

What we need

  • The structural BIM model (Revit or IFC), or structural plans and sections — CAD or paper
  • Year of construction and structural system — masonry or reinforced concrete — and whatever exists on the materials (original design, tests)
  • For Method II in reinforced concrete: the column reinforcement detailing
On our side

What you receive

  • Signed technical report, by a civil engineer who is a senior member of the Ordem dos Engenheiros
  • The classification under Portaria n.º 302/2019, on three levels: meets the demand · does not meet it, with no strengthening obligation (capacity between 90 % and 100 % of the demand) · seismic strengthening design mandatory (capacity below 90 %, art. 1.º, n.º 3)
  • The storey-by-storey verdict, with the governing method stated in full
  • The results sheet, explained, with the clauses applied and the error margins
  • Support for licensing, urban rehabilitation or purchase due diligence, within the domain of the methods

Seismic assessment, element by element.

Choose the typology to see the corresponding report — an excerpt of the Sismica.xlsx file from an actual run of the program on a test model, in Revit.

Sismica.xlsx

See the exact scope of the assessment ↓

Test model, run in Revit: solid brick masonry — rigid floors · 3 floors · 140 m² · seismic zones 1.3 and 2.3 · soil B. STRENGTHENING MANDATORY

BuildingTest building
Structural systemSolid brick masonry — rigid floors
No. of floors3
Plan area140 m²
Load-bearing walls18 of 18 read from the model
Seismic zones1.3 (type 1 action) and 2.3 (type 2 action)
Soil typeB
RegulationNP EN 1998-3:2017 (Anexo C) + AN
Result under Portaria n.º 302/2019STRENGTHENING MANDATORY

Capacity below 90 % of the demand → strengthening design mandatory (Portaria n.º 302/2019, art. 1.º, n.º 3). On the mainland both seismic actions of the National Annex, type 1 and type 2, are assessed and the more unfavourable one governs. Method I is a conservative screen; when Method II is assessed, it is Method II that decides — so a RED in Method I can coexist with a GREEN in Method II.

CriterionStatusValue
No. of floors ≤ 5GREEN3 floors
Plan area ≤ 350 m²GREEN140 m²
Importance class I or IIGREENclass II — III and IV require Method III
Soil type A/B/CGREENsoil B
Plan slenderness λ ≤ 4YELLOWλ ≈ 1.4, estimated from the longest wall in X and in Y — confirm on the plan
Both seismic actions on the mainland (type 1 and type 2)GREENzones assessed: 1.3 + 2.3
No partition walls < 0.10 m counted in resistanceGREENexcluded (0)
Residential buildingYELLOWthe methods are intended exclusively for residential buildings — confirm the use
Plan regularity (NP EN 1998-1)YELLOWmass/stiffness symmetry on 2 axes; setbacks ≤ 5% of area; e0x ≤ 0.30·rx; rx ≥ ls
Elevation regularity (NP EN 1998-1)YELLOWcontinuous systems; setbacks: (L1−L2)/L1 ≤ 0.20; single < 15%H: (L3+L1)/L ≤ 0.50
Interaction with adjacent buildingsYELLOWband: slab offset Δh ≤ 2/3·t (party wall); continuous party walls
Traditional masonry; in-plane mechanisms (box behaviour)YELLOWout-of-plane collapse not covered; ensure wall tying/restraint
Overall applicabilityYELLOW

Methods I and II applicable to this building, based on NP EN 1998-3 (Annex C) — the criteria in yellow depend on confirmation on site/in the design. Plan slenderness comes out yellow because the program estimates it from the longest wall in each direction, not from the plan.

WallDirFloortlh
W324821XFloor 10,35 m14,0 m2,9 m
W324825XFloor 10,35 m14,0 m2,9 m
W324828XFloor 10,20 m14,0 m2,9 m
W324826YFloor 10,25 m10,0 m2,9 m
W324827YFloor 10,25 m10,0 m2,9 m
W324829YFloor 10,20 m10,0 m2,9 m

+ 12 further walls in the full report (floors 1 to 3), each with its capacity calculation (Method II) by floor and direction.

By floor — Method II CS_E,j = η_j·CS_E, by zone
FloorCS_C,XCS_C,Y1.3: CS_E,j2.3: CS_E,j
Floor 10,3130,1620,2200,280
Floor 20,2660,1350,1870,238
Floor 30,2060,1030,1540,196
Method IMethod II
Zone 1.3 · direction XRED · 0,090 < 0,145GREEN · 0,206 ≥ 0,154 (floor 3)
Zone 1.3 · direction YRED · 0,050 < 0,145RED · 0,103 < 0,154 (floor 3)
Zone 2.3 · direction XRED · 0,090 < 0,187GREEN · 0,206 ≥ 0,196 (floor 3)
Zone 2.3 · direction YRED · 0,050 < 0,187RED · 0,103 < 0,196 (floor 3)
Result under Portaria n.º 302/2019STRENGTHENING MANDATORY — zone 1.3, direction Y; zone 2.3, direction Y (Method II)

In the red cases the capacity is between 52.6 % and 66.9 % of the demand — below the 90 % that makes a strengthening design mandatory (Portaria n.º 302/2019, art. 1.º, n.º 3). Method I: A_walls/A_floor ≥ α_E/β. Method II: CS_C,j ≥ η_j·CS_E, at the governing floor. Rigid floors: correction by expression (3) of RPEE III-14, checked storey by storey against the published Table 16.

Every result — Cover, Applicability or Columns, calculation per wall or per column, Report — comes in the results sheet, explained, with the clauses applied and the error margins.

Municipalities, insurers, condominiums, and anyone doing rehabilitation work.

Municipal councils and urban rehabilitation managers, insurers, condominiums of older buildings, developers buying to refurbish, and architecture studios that need a technical opinion before designing an intervention.

One proposal per building.

Two scopes, within the domain of the rapid methods. The price depends on the building and on what already exists — a structural BIM model or only plans and sections. Send us what you have and you receive the proposal, with a fixed price and timeline, before any commitment.

Base

By proposalfixed price before we start
  • Masonry up to 5 storeys and 350 m² in plan, or reinforced concrete up to 4 storeys and 400 m² — one structural type
  • Masonry: Methods I and II · reinforced concrete: Method I
  • Signed technical report, with the classification under Portaria n.º 302/2019
  • 5–10 working days
Request assessment

Don't have a BIM model of the building?

Without a digital model, we build the structural model from your plans and sections before running the assessment; the modelling is included in the proposal, depending on the building's size and complexity.

Domain of the methods: besides the number of storeys and the plan area, ground type A, B or C and regularity in plan and elevation; for masonry, plan slenderness up to 4; importance class I or II, for both materials. We confirm the building is within the domain before accepting the work.

Geographic scope: buildings in Portugal. The demand tables derive from the Portuguese National Annex to NP EN 1998-3, and the mandatory-strengthening threshold is the one set by Portaria n.º 302/2019 — they cannot be carried over to another country by translation, because each country has its own seismic zoning and national annex.

The assessment is carried out from the model or plans you send us, and assumes that information reflects the building as built. We do not confirm dimensions, materials, or the structure's condition on site.

Three steps, no red tape.

Scope

The assessment applies the expedited seismic vulnerability assessment methods published by LNEC, in accordance with Portaria no. 302/2019, within the domain of application of those methods, and is signed by a civil engineer, senior member of the Ordem dos Engenheiros, with a PhD in earthquake engineering. A building outside that domain is not assessed with these methods: we say so before accepting the work.

For structural engineering firms

We also work as external technical capacity when the workload peaks: the firm keeps the client and the project, and we deliver the assessment in 5 to 10 working days, at a fixed price per building.

Request a proposal for your building.

With these details we reply with the scope, price and timeline. If the building is outside the domain of the methods, or information is missing, we say so before any commitment.

Structure
Type of works
What you have of the building

We usually reply within 1 working day. The drawings are sent afterwards, in reply to our email.

Submitted details are stored in a private Cloudflare inbox for 90 days, solely to reply to your enquiry. Privacy.

Read next