Cubica
03
1D ContagemCountRecuentoComptage

MEP · Networks & Equipment.

Pipes, ducts and technical equipment counted directly from the MEP models — plumbing, HVAC, electrical — cross-validated against the room schedule.

See the exact scope of the measurement ↓

Linear networks and precise counts — no duplication between disciplines.

MEP networks are measured across three disciplines, often by three separate teams. The result: overlap in ceiling voids, equipment double-counted, equipment forgotten. Cubica processes all three models together, counts each element only once, and cross-references against the room schedule for validation.

On your side

What we need

  • Discipline models in Revit or IFC — plumbing, HVAC, electrical
  • MEP systems identified — type, fluid, diameter, cross-section
  • Equipment as parametric families — not generic blocks
On our side

What you receive

  • Pipework lengths (m) by system, diameter and material
  • Duct lengths (m) by system and cross-section (retangular, circular, dimensions)
  • Equipment counts by type and by room — pumps, units, panels, sanitary fixtures
  • Sanitary fixture counts per unit (WC, basin, shower base, bath, bidet)
  • Room-cross-referenced schedule — every piece of equipment validated against the space it should be in
  • 2D/3D drawing (DXF/DWG) of the networks and equipment — layered and colour-coded by system, with each element's ID and room/floor, matching directly to the Excel and the model

Linear networks + precise equipment counts.

Excerpt from MEP.xlsx — simplified example.

MEP.xlsx

Reference project: residential building · 44 units · 7 floors + basement · 2 145 m² plot.

Item Unit Quantity
HVAC — ducts
Rectangular duct (exhaust)m1 980
Rectangular duct (supply)m2 240
Circular ductm3 120
Ducts subtotalm7 340
Plumbing — pipework
Cold water (PVC-C, Ø 20-50)m2 680
Hot water (multilayer, Ø 20-32)m1 780
Waste water (PVC, Ø 40-110)m1 460
Plumbing pipes subtotalm5 920
Sanitary fixtures
Wall-hung WCun78
Basinun86
Shower baseun54
Bathun20
Bidetun12
Total sanitary fixturesun250
Technical equipment
Heat pumps / DHW cylindersun44
Ventilation units (MVHR)un44
Electrical panelsun48
Total equipmentun136

Every value is auditable back to the source element — filter by floor, by system, by discipline. At each design revision it reprocesses with no manual remeasuring.

Scope

Cubica measures every modelled element and returns the 3D/DXF of everything measured, so each quantity can be checked against its geometric origin. The scope of the measurement is, by definition, the content of the model supplied: elements that were never modelled, or modelled incorrectly upstream, cannot be measured by any extraction method — which is why we report in writing the omissions and inconsistencies we find along the way. The service is delivered from the model and documentation supplied, without a site visit.

Ready to get your sample?

Send us your BIM model — we'll come back with a sample in 1–5 working days.