Construction estimate calculator.

Units + floors → quantities and cost at risk. A quick estimate — and how much uncertainty a real measurement from the model removes.

Your project

Apartments / units in the building.
Floors above ground.
5 276
Estimated from units and floors.
Uncheck what you don't need — quantities and price adjust to the request.

Quantity estimate

Item Estimate by hand Cubica measurement
The range shows the uncertainty of a quick estimate. The exact value comes from measuring your model — here we use the range's midpoint as an example.
Budget error margin
± €80 mil
How much the cost can swing. It's the possible variation in the cost of concrete, steel and formwork when quantities come from a hand estimate (±10%) instead of being measured from the model. It's not the total project price nor the service cost — it's the error margin a real measurement removes.
Recommended service
Pro · €2.500
Request a real measurement →
The country adjustment uses the Arcadis International Construction Costs 2025 index, which compares the cost of building the same building across cities (Geneva 224, Lisbon 86, Madrid 82, on an Amsterdam = 100 base), damped to 65% because the work is done from Portugal. Construction prices use the undamped index. It's a public reference, not a table of our own — and the final figure is always confirmed in the proposal.
Assumptions (edit to fit your reality)
Project budget ≈ €5,8 M
Coefficients calibrated on Cubica's reference building (44 units, 7 floors: 1,849 m³ concrete, 219,400 kg steel, 9,623 m² formwork → 118.7 kg/m³). Indicative PT-market unit prices. Exterior finish area is estimated from a typical floor's perimeter (square-footprint approximation) × floor height × number of floors — an approximation, not a real facade measurement. The recommended service price also rises with the number of floors beyond its effect on area (more floors = more structural coordination/verification), to reflect that added complexity. Every project differs — an estimate is not a measurement.
Values are indicative estimates, not a quote or a measurement. A real measurement from your Revit/IFC model replaces every number with a value auditable to the element.